Post-Midterm Progress
In order to better understend my project I made a new schematic plan and section (on the left) for the midterm presentation.
In addition, it shoul represent how this passege weaves togather open and closed spaces of this condenced building (according to my first schemes).
The schematic plan showes the inner public passege and the diffrent situations that occur during the walk - from a connection beside the building to a passege in it (in the "guts" of the building) and finally walking along sice it again.
While making this scheme a few principle descisions were made -
(1) The building should be, and feel like, a rather solid mass (by choise of materials, opening design, ect.).
(2) The public passege inside it will slice a section of the buildeng as it passes, reveling the inner happening of the progect along the way - acting like a section plain.
(3) In reply, The passege will grow a special "skin" at the section. This skin will have a common material with the passege itself, and will make this reveling of the inside actions by the use of a transperent facade and outside spaces at the edge (porches tward the passege).
This model is a first trial to see the inner skin of my building in the places it is reveled to the public (mainly as an edge to the large public square).
On the skin I started developing special objects, that are supposed to make the transition between both sides of the skin, and contain special programs, according to the specific part of the building it's found.
These objects are in a different geometry and materials, and functions as a veranda, a private readinf room or even a uniqe gallery spece.

Sunday, January 06, 2008
Wednesday, December 12, 2007
Site Intervention 3 - Public/Private program
In order to analyze the different levels of public and private I started by defining all levels of privacy and what defines them in the relationship with others -(1) Totaly public - open access for everyone all day long (an open square or street). Usualy in ground level or conecting different levels of streets.
(2) Semi-public - open access but there is someone that is "incharge" of the space. couled be an indoor space (as the inside public space of a mall or the front of a shop). Usualy starts at street level but it's defined by roof or entrance (mistly open).
(3) Smei-private - only people with interest in a function or with a ticket can come in, intended for specific interest groups (like a museum or church). Usualy defined by an noticable entrance (mostly closed) and at ground level near public streets.
(4) Totaly private - belongs for a specific person or groupe in any given time (even if the space changes owners after a while), you should know if you belong there (a classroom or an office).
With these definitions I started developing a public passege that run throught the project and the relationships of this passege with all other program spaces - a gradient (mostly in section) of privacy that is most public in the hight of the passege in any point on the liniar progress of the building. The higher we go up or down from the passege hight the functions are more private.
In addition, I started to check the privacy and intemacy levels that are affected by the immediate context of the site I chose in width sections - from proximity to a future public square, streets and railway, ect. The points that the building reaches all these "special" connections it should react differently by the possition of programs that contribute to public life or close itself to protect from outside interferences.
Site Intervention 2 - Vegitative/Mineral program
I checked the possibility for using vegitative elements in the different programs, In the same way I analyzed open-closed relationships.For the next step, I tried to define the types of possibe relationships between vegitative and mineral elements in all scales, in a gradient of the intensity of the relationship -
(1) mineral that act as vegitative (as plstic plants, decorative tiles, ect.)
(2) vegitative that act as mineral (such as bamboo columns, unproccesed wood, ect.)
(3) Balance between vegitative and mineral (co-existance)
(4) mineral above vevitative (as in bridges above planting)
(5) vegitative above mineral (like roof planting)
(6)vegitative in mineral (in-door pot planting)
(7) mineral in vegitative (building totaly surounded by forest)
With these relationships I couls choose the ones who I could use in my project and it's location, and define where it could appear - a specific interpertation of green in plan and section.
For my specific project I developed a system that views vegitation as volume, for the space it occupy in plan and section - the volume in space that "feel" vegitative, from a garden (as a large hige volum) to a green wall (as a thin contained volum.
This interpertation of vegitation exsistance in the progect came from prior analysis, that viewed my project as a contained, condences sequence of open and closed programs and spaces. This way of thinking encouraged me to consider both out-door and in-door vegitations as part of the overall scheme (even if this interpertation is new to the site) and integrate them in the different programs.
Sunday, November 11, 2007
Site Intervention 1 - Open/Closed Program
Our first planing exercise was to analyze the college program (given with the exercise). My analysis was done in a few stages -
1. Mapping the given program, comparing relative areas.
2. Adding program elements i believe are missing and necessary for the function of the college in this location. I added a need for a large parking lot, larger area for the cafeteria\coffee shop, student gathering spaces - indoor and outdoor and a large high public square. After the studio discussion I feel the need to add two more functions - a wide lobby and library open spaces.
3. Dividing the program functions to three clusters, according to the possible clients of the different functions:
* Administrative functions - relates to commercial and office activities in all hours.
* Educational functions - turns mainly for the student and faculty.
* Public functions - open during all hours to outside visitors.
4. Dividing the program functions to three levels of openness\closeness:
* Totally open - functions that take place in different spaces open to the air (even if roofed).
* Related to open spaces - functions that need the border, require both open and closed spaces.
* Totally closed - function that need only indoor space (some connected to the outside by view and some sealed completely).
5. Separating the different clusters, with their open, closed and border spaces to three level heights. The heights were defined by the first vision - public functions will be in the top level, to take advantage of the sea view (and according to the urban perception take part of an heightened promenade), the educational function will receive the middle level (for privacy reasons for the student) and the lower street level will occupy the administrative functions (connecting to the street for practical reasons).
6. Condensing all the closed functions together to get a whole building mass.
7. Distorting the mass according to the types and shape of the public spaces that are created around the building - streets, narrow passages and open squares.
The first part of my analysis (stages 1-5) was inspired by the program alone, and the following was influenced by the site and the open spaces outside the building. in the course of the studio discussion I decided to return to step 5, and re-think the dispersal of open spaces, in a more conceptual, abstract and complicated manner, tightly based on my schemes.
Condensing the spaces to a single mass created a building that cannot be read clearly as I intended as three separated clusters.
1. Mapping the given program, comparing relative areas.2. Adding program elements i believe are missing and necessary for the function of the college in this location. I added a need for a large parking lot, larger area for the cafeteria\coffee shop, student gathering spaces - indoor and outdoor and a large high public square. After the studio discussion I feel the need to add two more functions - a wide lobby and library open spaces.
3. Dividing the program functions to three clusters, according to the possible clients of the different functions:
* Administrative functions - relates to commercial and office activities in all hours.
* Educational functions - turns mainly for the student and faculty.
* Public functions - open during all hours to outside visitors.
4. Dividing the program functions to three levels of openness\closeness:
* Totally open - functions that take place in different spaces open to the air (even if roofed).
* Related to open spaces - functions that need the border, require both open and closed spaces.
* Totally closed - function that need only indoor space (some connected to the outside by view and some sealed completely).
5. Separating the different clusters, with their open, closed and border spaces to three level heights. The heights were defined by the first vision - public functions will be in the top level, to take advantage of the sea view (and according to the urban perception take part of an heightened promenade), the educational function will receive the middle level (for privacy reasons for the student) and the lower street level will occupy the administrative functions (connecting to the street for practical reasons).
6. Condensing all the closed functions together to get a whole building mass.7. Distorting the mass according to the types and shape of the public spaces that are created around the building - streets, narrow passages and open squares.
The first part of my analysis (stages 1-5) was inspired by the program alone, and the following was influenced by the site and the open spaces outside the building. in the course of the studio discussion I decided to return to step 5, and re-think the dispersal of open spaces, in a more conceptual, abstract and complicated manner, tightly based on my schemes.
Condensing the spaces to a single mass created a building that cannot be read clearly as I intended as three separated clusters.
Monday, November 05, 2007
Site Analysis - Ecology Layer
Examining the site in 8 different sub-layers: Water, Soil, Open spaces, appearance, Noise, Flora, Fauna and Air (some of the layers are visible in the attached strip). The first Map attached is an overlap of all the sub-layers - New, wasn't presented in the studio.
1. Water - The harbor and it's construction, as is the industrial activity in the bay area, caused water pollution, stream regime changes and aquatic habitat destruction. all these require tending to before a direct contact with the water is possible.
2. Soil - The soil of the site is reclaimed from the bottom of the bay, a process that has many environmental effects (future planing includes further reclamation). Specific soil type is not ideal for planting. The industrial work on the site in the past might left the ground polluted in some level.
3. Open spaces - Exist in the site, mostly as parking lots, but due to recent works on "The harbor campus" an urban square and pedestrian mall are underway.
4. Appearance - Due to the recent efforts the area is relatively clean and in the process of facade renovation (for the Holiday building). From the studio discussion it is not totally clear if this subject is relevant for the ecology layer.
5. Noise - The major noise sources are the port industrial activity, passing trains (both noticeable mostly in the back of the site), passing traffic in near streets (filtered greatly by the long Holiday building) and construction noise from the renovations within the site (temporary).
6. Flore - Most of the vegetation is planted and not natural, possibly because of unfitting or polluted soil.
7. Fauna - pigeons, bats and mice are present in large numbers (for different reasons), and pose a planing challenge.
8. Air - Wind flows, mainly parallel to the street and building rows, carry at night industrial pollution and odors through the site.
Thursday, November 01, 2007
First Vision
The city block we are examining has two very definite borders, to "Haatzmaut" and "Shaar palmer" streets. It's back border is not defined - back roads, backsides of buildings and garages. The final border is the fenced railway, a no man's land.Ideally, in the future, the Haifa port and the railway won't be such a barrier. A realistic point of view indicates that, for at least a few years, these barriers and the industry in the area will still exist. Creating a new back block edge, one that allows for eye contact but no direct link, can define a space for living, working and learning.
Downtown Haifa lacks open spaces (urban and natural), that are a must for an active public and street life, especially for young studential population. Yet, our specific block is build on reclaimed land, dried in the beginning of the last century. On site research showed no on-ground planting, probably due to polluted or un-fitting filling soil.
Dealing with an only half-full block (due to demolition of vacant warehouses and currant parking needs) with ground-level constraints allows for development of a new type of urban open spaces.
Site Pictures
For some pictures of our site, from several visits, see link -http://picasaweb.google.com/sayeleta/0708
Welcome to my new Blog!
To everyone who knows me already, this is very unusual and nothing like me, but it's worth a shot... This year's project is in downtown Haifa, as part of the future plan of "The Harbor Campus" - integrating a university/college campus and dorm in an older rundown part of the city.